How badly is the Minister of Energy “CONNING” the people of Ontario?????

Posted: August 2, 2013 in Uncategorized

A few days ago we posted an article titled “Why NOBODY should trust one single thing this Ontario Liberal Government tells us!”

Here we delve even deeper into the Ontario Power Authority’s directive made by Chiarelli that stakeholders, Municipalities and Aboriginal groups become engaged in talks over the Long Term Energy Plan that the Liberal Government wants to “refine”!

There is only one problem here. The Long Term Energy Plan has already been unleashed on Ontarians and is without a doubt, hopelessly out of control so badly that no conversation let alone actions at this point by ANYONE will stop the destruction it is causing now, and will cause for decades to come.

The  “Energy Plan” for the sake of a better description or what most normal people would call an “insane plan to ruin an Industrial based economy” has been forged by 8 “Ministers of Energy” in 10 years that is the ROOT of Ontario’s financial downfall and should at the very least be considered a criminal action with severe consequences for each and every Minister that has his fingerprints on it!

The Ontario Power Authority: Engaging with “stakeholders” after Burning the Bridges

The Press Release from the OPA issued on August 1, 2013 spoke to how they wish to engage “with stakeholders, municipalities and Aboriginal communities.” to develop a “new competitive procurement process for large renewable projects”. This “engagement” was driven by a June 12, 2013 directive from Bob Chiarelli, the current Ontario Minister of Energy but for some reason it has taken the OPA over a month and a half to undertake his directions. These engagements with the stakeholders are to wrap up by August 19, 2013 and the recommendations will be summarized and presented to Minister Chiarelli by September 1, 2013.

Picture from Ottawa Sun

The amusing part of this process is that the OPA has (according to their March 31, 2013 report) already contracted for 22,282 MW and that doesn’t include any of the reported 2,600 MW of conservation that they claim in the chart on their Status, Outlook and Options for Electricity Service , paper released in support of the Long-Term Energy Plan Review that Minister Chiarelli has instituted.

It should also be noted that it was the OPA who presumably contracted for the Greenfield and TransCanada gas plants which have cost the ratepayers and taxpayers a minimum of $585 million for absolutely NO POWER! The Mississauga Greenfield process of “competitive procurement” resulted in two contracts awarded to a company that could not secure financing resulting in most of the the huge settlement associated with the movement of that gas plant to Lambton. One of the two contracts awarded was eventually cancelled but the latter cost, to Ontario’s ratepayers and taxpayers, went to satisfy the almost usurious rates charged to them by the party that eventually provided the financing for the Mississauga gas plant.

So having seen what appears to be a previously flawed procurement process and the OPA’s claim of having contracted for almost 25,000 MW of power (enough to power almost 23 million homes) the OPA now gets instructions from the Minister to engage stakeholders in the process. Hmmm!

To most sane people, the sudden realization by the Liberal Energy Minister that the whole process was flawed this late in the game should be a strong indication that the oversight that the “political masters” should have provided was instead usurped by the ministerial directives that found their way to the OPA from the eight Liberal Energy Ministers Ontario occupying that chair over the past 10 years of Liberal rule. Two of those previous Ministers resigned from Cabinet (Dwight Duncan and Chris Bentley) and in the August 1st by-election both of those seats were lost by the Liberals. That the LTEP “under review” was a “guide” released by Brad Duguid, when Minister of Energy; is a clear indication that there was no oversight and instead the politicians occupying that seat of power treated it as their personal fiefdom dictating what they viewed as what Ontario’s electricity sector should become.

For Minister Chiarelli to suddenly try to revise the LTEP, in this writer’s humble opinion, is merely optics. The OPA’s March 31, 2013 report mentioned above indicates they have contracted for 1,996 MW of solar and 5,797 MW of wind which will do nothing more than drive up the cost of electricity in the province while providing unreliable intermittent power.

The Bridges have been truly burned by the Liberals and future generations of Ontarians will have a tough job rebuilding them.

Parker Gallant,
August 2, 2013

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s